Skip to content

feat: evm multi chain signer #10

feat: evm multi chain signer

feat: evm multi chain signer #10

Triggered via pull request November 15, 2024 15:18
Status Failure
Total duration 1d 18h 20m 51s
Artifacts

test.yml

on: pull_request
yarn-install
59s
yarn-install
Matrix: agent-configs
Matrix: e2e-matrix
Matrix: env-test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
env-test (mainnet3, arbitrum, core)
Process completed with exit code 1.
env-test (mainnet3, optimism, core)
Process completed with exit code 1.
env-test (mainnet3, arbitrum, igp)
The job running on runner GitHub Actions 13 has exceeded the maximum execution time of 10 minutes.
env-test (mainnet3, arbitrum, igp)
The operation was canceled.
e2e-matrix (cosmwasm)
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
e2e-matrix (non-cosmwasm)
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.