Skip to content

Commit

Permalink
Update docs/example-narratives/temporary-ratings.md
Browse files Browse the repository at this point in the history
Co-authored-by: Christopher Atkins <[email protected]>
Signed-off-by: Tory McKeag <[email protected]>
  • Loading branch information
getorymckeag and catkins-miso authored Nov 4, 2024
1 parent f884874 commit 1254bee
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion docs/example-narratives/temporary-ratings.md
Original file line number Diff line number Diff line change
Expand Up @@ -6,7 +6,7 @@ toc: true
---

# Temporary Ratings
FERC order 881 includes a provision for a "reliability safety valve" that allows grid operators
FERC Order 881 includes a provision that allows grid operators
to temporarily set aside AARs to address immediate threats to reliability by
temporarily using an alternate static rating for a facility. These temporary ratings used
must be documented and stored in a database, accessible for 5 years.
Expand Down

0 comments on commit 1254bee

Please sign in to comment.