util: split the tests of workloadrepo into multiple shard (#59030) #5
Annotations
4 errors and 3 warnings
integration-test (8.0.26)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 15 minutes.
|
integration-test (8.0.26)
The operation was canceled.
|
integration-test (8.4.3)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 15 minutes.
|
integration-test (8.4.3)
The operation was canceled.
|
integration-test (8.0.22)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
integration-test (5.7.35)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
integration-test (8.0.37)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|