feat: v4.0.1 #590
main.yml
on: pull_request
Groth16 Native
4m 15s
Groth16 Docker
4m 10s
Plonk Native
4m 3s
Plonk Docker
4m 2s
Check branch
0s
Example (SSZ Withdrawals)
4m 23s
Example (Cycle Tracking)
3m 21s
Example (Tendermint)
4m 21s
Run all tests for patches in the vm
4m 26s
Annotations
16 errors and 1 warning
Groth16 Docker
Canceling since a higher priority waiting request for 'Main-1941' exists
|
Groth16 Docker
The operation was canceled.
|
Plonk Native
Canceling since a higher priority waiting request for 'Main-1941' exists
|
Plonk Native
The operation was canceled.
|
Plonk Docker
Canceling since a higher priority waiting request for 'Main-1941' exists
|
Plonk Docker
The operation was canceled.
|
Groth16 Native
Canceling since a higher priority waiting request for 'Main-1941' exists
|
Groth16 Native
The operation was canceled.
|
Example (Cycle Tracking)
Canceling since a higher priority waiting request for 'Main-1941' exists
|
Example (Cycle Tracking)
The operation was canceled.
|
Example (SSZ Withdrawals)
Canceling since a higher priority waiting request for 'Main-1941' exists
|
Example (SSZ Withdrawals)
The operation was canceled.
|
Run all tests for patches in the vm
Canceling since a higher priority waiting request for 'Main-1941' exists
|
Run all tests for patches in the vm
The operation was canceled.
|
Example (Tendermint)
Canceling since a higher priority waiting request for 'Main-1941' exists
|
Example (Tendermint)
The operation was canceled.
|
Check branch
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|