chore: update to stable2409-4
#3172
Triggered via pull request
January 30, 2025 14:59
Status
Cancelled
Total duration
1h 33m 38s
Artifacts
–
test.yml
on: pull_request
build-chain-spec-generator
3m 48s
Extract integration tests from matrix
2s
Extract runtimes from matrix
2s
All tests passed
0s
Annotations
4 errors
build-chain-spec-generator
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
build-chain-spec-generator
The operation was canceled.
|
integration-test (bridge-hub-polkadot, bridge-hub-polkadot-integration-tests)
Canceling since a higher priority waiting request for 'Test all features-568' exists
|
integration-test (bridge-hub-polkadot, bridge-hub-polkadot-integration-tests)
The operation was canceled.
|