Skip to content

Merge pull request #2525 from SteffenMeinecke/fix/line_geo_from_buses #4098

Merge pull request #2525 from SteffenMeinecke/fix/line_geo_from_buses

Merge pull request #2525 from SteffenMeinecke/fix/line_geo_from_buses #4098

Triggered via push February 14, 2025 12:54
Status Failure
Total duration 12m 13s
Artifacts 2
Matrix: build
tutorial_tests
12m 0s
tutorial_tests
tutorial_warnings_tests
11m 31s
tutorial_warnings_tests
Sphinx docs check
37s
Sphinx docs check
Matrix: julia
Matrix: linting
Matrix: postgresql
Matrix: relying
Matrix: warnings
upload-coverage
22s
upload-coverage
Fit to window
Zoom out
Zoom in

Annotations

9 errors
warnings (3.12, 1)
Process completed with exit code 2.
warnings (3.12, 2)
The job was canceled because "_3_12_1" failed.
relying (3.12)
Process completed with exit code 1.
relying (3.9)
The job was canceled because "_3_12" failed.
relying (3.9)
The operation was canceled.
relying (3.10)
The job was canceled because "_3_12" failed.
relying (3.10)
The operation was canceled.
relying (3.11)
The job was canceled because "_3_12" failed.
relying (3.11)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
coverage-1
83.9 KB
coverage-2
83.4 KB