Compatibility E2E Test(API v2 - Rust Client) #1904
compatibility-e2e-v2.yml
on: schedule
Matrix: compatibility_e2e_tests
Annotations
7 errors and 1 warning
compatibility_e2e_tests (client)
Process completed with exit code 1.
|
compatibility_e2e_tests (scheduler)
The job was canceled because "client" failed.
|
compatibility_e2e_tests (scheduler)
The operation was canceled.
|
compatibility_e2e_tests (seed-client)
The job was canceled because "client" failed.
|
compatibility_e2e_tests (seed-client)
The operation was canceled.
|
compatibility_e2e_tests (manager)
The job was canceled because "client" failed.
|
compatibility_e2e_tests (manager)
The operation was canceled.
|
compatibility_e2e_tests (seed-client)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
client-e2e-tests-logs
|
6.96 MB |
|
dragonflyoss~dragonfly~0CC6Q4.dockerbuild
|
43.6 KB |
|
dragonflyoss~dragonfly~82BCAE.dockerbuild
|
43.7 KB |
|
dragonflyoss~dragonfly~MOEKGZ.dockerbuild
|
43.2 KB |
|
dragonflyoss~dragonfly~PPT5TZ.dockerbuild
|
51.1 KB |
|
dragonflyoss~dragonfly~RC8UL6.dockerbuild
|
50.3 KB |
|
dragonflyoss~dragonfly~S0SVKJ.dockerbuild
|
50.6 KB |
|
dragonflyoss~dragonfly~U3WHMO.dockerbuild
|
49.8 KB |
|
dragonflyoss~dragonfly~YG2A7Q.dockerbuild
|
43.9 KB |
|
manager-e2e-tests-logs
|
1 GB |
|
scheduler-e2e-tests-logs
|
1 MB |
|