-
Notifications
You must be signed in to change notification settings - Fork 4
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
Update V-Sekai Deck Log - 2025-02-15 (Saturday).
- Loading branch information
Showing
1 changed file
with
26 additions
and
0 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,26 @@ | ||
# V-Sekai Deck Log - 2025-02-15 (Saturday) | ||
|
||
**1. Project Status - Team Activity:** | ||
|
||
- **Location:** Vancouver Region (YVR) | ||
- **Environmental Conditions:** Winter season | ||
- **Active Contributors:** Astral Druid, Lyuma, Fire | ||
|
||
- **Astral Druid:** | ||
- Finalizing event assets | ||
- **Lyuma:** | ||
- VR UI via lassodb and https://github.com/V-Sekai/V-Sekai.godot-gui-in-vr/blob/master/addons/gui_in_vr/player/controller_ray_cast.gd | ||
- Use UIDs in addition to paths for extracted meshes, materials and animations #100786 | ||
- **Fire:** | ||
- Prototype & Voting system validation | ||
|
||
- **Group Activities Pending:** | ||
- V-Sekai meetup in Discord | ||
|
||
**2. Blockers:** | ||
- Prototype iteration | ||
|
||
**3. Planned Work:** | ||
|
||
- **Key Goals:** | ||
- GDC 2025 schedule alignment |