Skip to content

Commit

Permalink
Update V-Sekai Deck Log - 2025-02-15 (Saturday).
Browse files Browse the repository at this point in the history
  • Loading branch information
fire committed Feb 16, 2025
1 parent 72e07df commit 6c5903a
Showing 1 changed file with 26 additions and 0 deletions.
26 changes: 26 additions & 0 deletions changelog/2025/20250215-deck-log.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,26 @@
# V-Sekai Deck Log - 2025-02-15 (Saturday)

**1. Project Status - Team Activity:**

- **Location:** Vancouver Region (YVR)
- **Environmental Conditions:** Winter season
- **Active Contributors:** Astral Druid, Lyuma, Fire

- **Astral Druid:**
- Finalizing event assets
- **Lyuma:**
- VR UI via lassodb and https://github.com/V-Sekai/V-Sekai.godot-gui-in-vr/blob/master/addons/gui_in_vr/player/controller_ray_cast.gd
- Use UIDs in addition to paths for extracted meshes, materials and animations #100786
- **Fire:**
- Prototype & Voting system validation

- **Group Activities Pending:**
- V-Sekai meetup in Discord

**2. Blockers:**
- Prototype iteration

**3. Planned Work:**

- **Key Goals:**
- GDC 2025 schedule alignment

0 comments on commit 6c5903a

Please sign in to comment.