Continuous Integration #84
ci.yml
on: schedule
test_docs
29s
test_requirements_lock
6s
Matrix: test
Annotations
14 errors
test_requirements_lock
Process completed with exit code 1.
|
test (macos-latest, 3.10)
Process completed with exit code 1.
|
test (ubuntu-latest, 3.10)
The job was canceled because "macos-latest_3_10" failed.
|
test (ubuntu-latest, 3.10)
Process completed with exit code 1.
|
test (macos-latest, 3.12)
The job was canceled because "macos-latest_3_10" failed.
|
test (macos-latest, 3.12)
Process completed with exit code 1.
|
test (ubuntu-latest, 3.11)
The job was canceled because "macos-latest_3_10" failed.
|
test (ubuntu-latest, 3.11)
The operation was canceled.
|
test (macos-latest, 3.11)
The job was canceled because "macos-latest_3_10" failed.
|
test (macos-latest, 3.11)
Process completed with exit code 1.
|
test (windows-latest, 3.10)
The job was canceled because "macos-latest_3_10" failed.
|
test (windows-latest, 3.10)
The operation was canceled.
|
test (ubuntu-latest, 3.12)
The job was canceled because "macos-latest_3_10" failed.
|
test (ubuntu-latest, 3.12)
The operation was canceled.
|