Skip to content

Continuous Integration #80

Continuous Integration

Continuous Integration #80

Triggered via schedule February 2, 2025 01:48
Status Failure
Total duration 53s
Artifacts

ci.yml

on: schedule
test_docs
28s
test_docs
test_requirements_lock
7s
test_requirements_lock
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

16 errors
test_requirements_lock
Process completed with exit code 1.
test (macos-latest, 3.10)
Process completed with exit code 1.
test (macos-latest, 3.12)
The job was canceled because "macos-latest_3_10" failed.
test (macos-latest, 3.12)
Process completed with exit code 1.
test (windows-latest, 3.10)
The job was canceled because "macos-latest_3_10" failed.
test (windows-latest, 3.10)
The operation was canceled.
test (windows-latest, 3.12)
The job was canceled because "macos-latest_3_10" failed.
test (windows-latest, 3.12)
The operation was canceled.
test (macos-latest, 3.11)
The job was canceled because "macos-latest_3_10" failed.
test (macos-latest, 3.11)
The operation was canceled.
test (ubuntu-latest, 3.11)
The job was canceled because "macos-latest_3_10" failed.
test (ubuntu-latest, 3.11)
The operation was canceled.
test (ubuntu-latest, 3.10)
The job was canceled because "macos-latest_3_10" failed.
test (ubuntu-latest, 3.10)
The operation was canceled.
test (ubuntu-latest, 3.12)
The job was canceled because "macos-latest_3_10" failed.
test (ubuntu-latest, 3.12)
The operation was canceled.