Continuous Integration #78
ci.yml
on: schedule
test_docs
1m 3s
test_requirements_lock
6s
Matrix: test
Annotations
11 errors
test_requirements_lock
Process completed with exit code 1.
|
test (macos-latest, 3.12)
Process completed with exit code 1.
|
test (macos-latest, 3.11)
Process completed with exit code 1.
|
test (ubuntu-latest, 3.10)
The job was canceled because "macos-latest_3_12" failed.
|
test (ubuntu-latest, 3.10)
The operation was canceled.
|
test (ubuntu-latest, 3.12)
The job was canceled because "macos-latest_3_12" failed.
|
test (ubuntu-latest, 3.12)
The operation was canceled.
|
test (ubuntu-latest, 3.11)
The job was canceled because "macos-latest_3_12" failed.
|
test (ubuntu-latest, 3.11)
The operation was canceled.
|
test (macos-latest, 3.10)
The job was canceled because "macos-latest_3_12" failed.
|
test (macos-latest, 3.10)
The operation was canceled.
|