Skip to content

Continuous Integration #63

Continuous Integration

Continuous Integration #63

Triggered via schedule January 16, 2025 01:43
Status Failure
Total duration 51s
Artifacts

ci.yml

on: schedule
test_docs
27s
test_docs
test_requirements_lock
7s
test_requirements_lock
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 2 warnings
test (macos-latest, 3.12)
Process completed with exit code 1.
test (windows-latest, 3.11)
The job was canceled because "macos-latest_3_12" failed.
test (macos-latest, 3.11)
The job was canceled because "macos-latest_3_12" failed.
test (macos-latest, 3.11)
The operation was canceled.
test (ubuntu-latest, 3.10)
The job was canceled because "macos-latest_3_12" failed.
test (ubuntu-latest, 3.10)
The operation was canceled.
test (windows-latest, 3.12)
The job was canceled because "macos-latest_3_12" failed.
test (windows-latest, 3.12)
The operation was canceled.
test (ubuntu-latest, 3.12)
The job was canceled because "macos-latest_3_12" failed.
test (ubuntu-latest, 3.12)
The operation was canceled.
test (macos-latest, 3.10)
The job was canceled because "macos-latest_3_12" failed.
test (macos-latest, 3.10)
The operation was canceled.
test (ubuntu-latest, 3.11)
The job was canceled because "macos-latest_3_12" failed.
test (ubuntu-latest, 3.11)
The operation was canceled.
test_requirements_lock
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test_docs
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636