Update variable group for prepare-pipelines #22959
+1
−1
Merged
Azure Pipelines / go - aztemplate - ci
succeeded
May 29, 2024 in 6m 55s
Build #20240529.1 succeeded
Details
- Failed: 0 (0.00%)
- Passed: 6 (100.00%)
- Other: 0 (0.00%)
- Total: 6
- 14 of 22 lines covered (63.64%)
Annotations
Check failure on line 22 in Build log
azure-pipelines / go - aztemplate - ci
Build log #L22
The changelog entry did not contain any of the recommended sections (Features Added, Breaking Changes, Bugs Fixed, Other Changes), please add at least one. See https://aka.ms/azsdk/guideline/changelogs for more info.
Loading