You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The test plan for [TC-CC-3.2] has been updated to modify the timing, ensuring that the range tolerance does not span wrap for test steps 2c and 2d. However, the current YAML script does not reflect these updates, and adjustments are needed to align the script with the updated test plan.
Modify the wait time in the YAML script for test steps 2c and 2d as per the updated test plan.
test step 2d repeated twice instead of 2c
The text was updated successfully, but these errors were encountered:
Rajashreekalmane
changed the title
[TC-CC-3.2] - Update YAML Script for [TC-CC-3.2]: Modify Timing for Test Steps 2c, 2d, and 5
[TC-CC-3.2] - Update YAML Script for [TC-CC-3.2]: Modify Timing for Test Step 2C and 2d
Jan 21, 2025
Description:
The test plan for [TC-CC-3.2] has been updated to modify the timing, ensuring that the range tolerance does not span wrap for test steps 2c and 2d. However, the current YAML script does not reflect these updates, and adjustments are needed to align the script with the updated test plan.
Test Plan Update Reference: https://github.com/CHIP-Specifications/chip-test-plans/pull/4662
Script Reference: https://github.com/project-chip/connectedhomeip/blob/master/src/app/tests/suites/certification/Test_TC_CC_3_2.yaml
Required Updates:
The text was updated successfully, but these errors were encountered: