Notifications
You must be signed in to change notification settings - Fork 1
/
Copy pathData_intro_ElectricThermal_NetworkBarryIsalnd.m
276 lines (235 loc) · 10.3 KB
/
Data_intro_ElectricThermal_NetworkBarryIsalnd.m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
clc; clear variables
% see [1] for the original description of the heat-electric power network
% case study and [2] for an application within a stochastic optimization framwork
% [1] Xuezhi Liu et al "Combined analysis of electricity and heat networks ", Applied Energy,
% Volume 162, 15 January 2016, Pages 1238-1250
% DOI https://doi.org/10.1016/j.apenergy.2015.01.102
% [2] R.Rocchetta and E.Patelli, "Stochastic analysis and reliability-cost optimization
% of distributed generators and air source heat pumps", 2017 2nd International Conference on System Reliability and Safety (ICSRS)
% https://strathprints.strath.ac.uk/72133/1/https://ieeexplore.ieee.org/document/8272792.pdf
%% Example of how to define a data structure for the electric network
% System topology clc; clear variables
% see [1] for the original description of the heat-electric power network
% case study and [2] for an application within a stochastic optimization framwork
% [1] Xuezhi Liu et al "Combined analysis of electricity and heat networks ", Applied Energy,
% Volume 162, 15 January 2016, Pages 1238-1250
% DOI https://doi.org/10.1016/j.apenergy.2015.01.102
% [2] R.Rocchetta and E.Patelli, "Stochastic analysis and reliability-cost optimization
% of distributed generators and air source heat pumps", 2017 2nd International Conference on System Reliability and Safety (ICSRS)
% https://strathprints.strath.ac.uk/72133/1/https://ieeexplore.ieee.org/document/8272792.pdf
% Temp=load('D.mat');
% Del= Temp.D.Del; % electrical grid data
% Dth= Temp.D.Dth; % thermal grid data
%% Example of how to define a data structure for the electric network
% System topology
Del.NDn=8; % number of nodes
Del.FDn=7; % number of feeders (links between the nodes)
Del.FDks=[1;2;3;4;8;5;6]; % start node
Del.FDke=[2;3;4;8;5;6;7]; % end node
Del.FDAmp=[400;400;400;400;400;400;400]; % Ampacity [A], maxiumum current a cable can carry without exceeding its thermal limit
% Nodes parameters (generators positions and propreties
Del.MSn=3; % number of main generator sources
Del.MStyp=[1;2;1]; % Generators Type: one is Gas Turbine(2) and two is-steam Turbines (1)
Del.MSnod=[2,7,8]; % nodes where the main generating sources are located
Del.DGtn=4; %
% links (power cables) parameters
Del.FDX=0.08; % Reactance [Ohm/km]
Del.FDR=0.164; % Resistance [Ohm/km]
Del.Lengths=[260;170;230;320;200;160;260]; % Lenght of the links
% Nodes parameters (random power demanded, produced and base voltage)
Del.muLDth=[0.2;0;0.5;0.5;0.2;0.2;0;0]; % mean Load Demand
Del.stdLDth=[0.02;0;0.05;0.05;0.02;0.02;0;0]; % standard deviation of the Demand
Del.MSmu=[20;10;20]; % mean power produced by the main generators
Del.MSsig=[2;1;2]; % standard deviation of the power produced by the main generators
Del.Vnom=11; % base voltage in [kV]
% Cost data
Del.Cm=[1.3;1/0.79]; % Cost for Gas Turbine(2) and two is-steam Turbines (???)
Del.MSCo=0.1450; % Main Generators operational cost
Del.PVCo=3.7670e-05; % Potovolt operational cost
Del.WCo=0.0390; % Wind Turbine operational cost
Del.EVCo=0.0210; % El Vehicles operational cost
Del.STCo=4.6284e-5; % Storage operational cost
Del.VGCo=1e9; % Virtual generators operational cost
Del.Z=8.1; % t.b.d.
Del.MScap=[40;40;50]; % t.b.d.
% Distributed generators data and production cost
Del.pckg=[50,1,1,50];% pakaging factors
Del.VGcap=10000; % Virtual generators capacity (virtually inf)
Del.ts=1; % 1-h simulation time step
Del.STn=1; % storages number of technologies
Del.STEs=0.04; % storage parameter
Del.STPpeak=0.2800; % storage peak output
Del.PVn=1; % PV number of technologies
Del.PVTa=30; % PV parameters
Del.PVTno=43; %
Del.PVIsc=1.8; %
Del.PVItc=1.4;%
Del.PVVoc=55.5; %
Del.PVVtc=194;%
Del.PVVPmax=38;%
Del.PVIPmax=1.32;%
Del.EVPp=6.73;% EV power
Del.SCn=300;%
Del.Inc=0.0240; %
Del.MScm=1.3;%
Del.SCn=7e2;%
Del.WWSrated=9.5; % rated Wind
Del.Eprice=@(L)-5.13717E-09*L^2+5.31538E-05*L; % price of the electricity from the total load demanded L
%% Barry island: Load the Heat District Network data
Temp=load('D.mat');
Dth=Temp.D.Dth; % load the structure of the 'thermal' network
%% show topology of the two networks (not linked)
G_th=graph(Dth.From_Node,Dth.To_Node);
G_th.plot;
hold on; grid on
G_el=graph(Del.FDks,Del.FDke);
G_el.plot
legend('Thermal nodes', 'Electrical nodes')
%% Sample External Environmental Conditions
long=-3.27; % Barry Island UK Longitude
lat=51.3; % Barry Island UK Latitude
SCn= 200; % Number of samples
Ndays=5; % number of days
[ITot,ws,~,~]=Weather_Simulator(SCn,long,lat,24*Ndays); % Generate weather history
% ITot clear sky irradiance
% ws wind speed
% s total 'real' irradiance
a= 0.2579; b= 0.7264; % distribution parameters
s=betarnd(a , b,size(ITot)).*ITot;
Tamb=normrnd(6,3); % Example of normal distributed Temperature
subplot(2,1,1)
% display weather samples
plot(ITot); hold on;
xlabel('IX of the simulated hour'); ylabel('irradiance')
plot(s,'.-r'); legend('clear sky irr', 'with cloud cover')
subplot(2,1,2)
plot(ws); hold on;
xlabel('IX of the simulated hour'); ylabel('wind speed [m/s]')
%% 1) Start With Electric Network Economic Dispatch
% The Generators Allocation Matrix
%x=zeros(Del.NDn,Del.DGtn+1); % zero generators over the NDn nodes and for the Del.DGtn+1 technologies
% user-defined el-grid allocation matrix
% MS PV WT EV ST
x=[ 0,11, 0, 0, 13 % node 1
0, 0, 1, 0, 15 % node 2
0, 4, 4, 0, 5 % node 3
0, 0, 0, 0, 5 % node 4
0, 4, 0, 0, 20 % node 5
0, 0, 0, 0, 2 % node 6
0, 1, 1, 0, 0 % node 7
0, 9, 1, 0, 40]; % node 8
x(Del.MSnod,1)=1; % add main generators in the first colum
% the meccanical states
FDmecst=ones(Del.FDn,1); %feeders meccanical state
NETmecst=ones(Del.NDn,Del.DGtn+1); %feeders meccanical state
% Loads
LD=normrnd(Del.muLDth,Del.stdLDth); % MWel of the 5 lumped electrical loads
% MS (Main power sources)
MSPp = normrnd(Del.MSmu, Del.MSsig);
MSPav = MSPp(ones(Del.NDn,1),:);
% Distirbuted generators (DG)
DGmdl=DG_module();% define generic DG module
% Photovoltaic PV
Sun= 1; % irradiance
Text=29; % ambient temperature
PVPav=DGmdl.Power_PV(Sun,Text,Del.NDn); % available power from PV pannles
PVPav = PVPav.*NETmecst(:,2).*x(:,2);
% Wind turbines WT
WSpeed=15; % wind speed
WPav=DGmdl.Power_WT(WSpeed,Del.NDn); % available power from wind turbines
WPav = WPav.*NETmecst(:,3).*x(:,3);
% Electric Vehicles EV (to do)
%..
EVav=zeros(Del.NDn,1);
% Storages (ST)
STPav=DGmdl.Power_ST(Del.NDn); % available power from storages
STPav = STPav.*NETmecst(:,5).*x(:,5); % remove failed comp and use allocation matrix
%Matrix of electric power Available
NETPavM = [MSPav PVPav WPav EVav STPav].*[ones(Del.NDn,1) Del.pckg(ones(Del.NDn,1), 1:4 )];
Del.NDn=8; % number of nodes
Del.FDn=7; % number of feeders (links between the nodes)
Del.FDks=[1;2;3;4;8;5;6]; % start node
Del.FDke=[2;3;4;8;5;6;7]; % end node
Del.FDAmp=[400;400;400;400;400;400;400]; % Ampacity [A], maxiumum current a cable can carry without exceeding its thermal limit
% Nodes parameters (generators positions and propreties
Del.MSn=3; % number of main generator sources
Del.MStyp=[1;2;1]; % Generators Type: one is Gas Turbine(2) and two is-steam Turbines (1)
Del.MSnod=[2,7,8]; % nodes where the main generating sources are located
Del.DGtn=4; %
% links (power cables) parameters
Del.FDX=0.08; % Reactance [Ohm/km]
Del.FDR=0.164; % Resistance [Ohm/km]
Del.Lengths=[260;170;230;320;200;160;260]; % Lenght of the links
% Nodes parameters (random power demanded, produced and base voltage)
Del.muLDth=[0.2;0;0.5;0.5;0.2;0.2;0;0]; % mean Load Demand
Del.stdLDth=[0.02;0;0.05;0.05;0.02;0.02;0;0]; % standard deviation of the Demand
Del.MSmu=[20;10;20]; % mean power produced by the main generators
Del.MSsig=[2;1;2]; % standard deviation of the power produced by the main generators
Del.Vnom=11; % base voltage in [kV]
% Cost data
Del.Cm=[1.3;1/0.79]; % Cost for Gas Turbine(2) and two is-steam Turbines (???)
Del.MSCo=0.1450; % Main Generators operational cost
Del.PVCo=3.7670e-05; % Potovolt operational cost
Del.WCo=0.0390; % Wind Turbine operational cost
Del.EVCo=0.0210; % El Vehicles operational cost
Del.STCo=4.6284e-5; % Storage operational cost
Del.VGCo=1e9; % Virtual generators operational cost
Del.Z=8.1; % t.b.d.
Del.MScap=[40;40;50]; % t.b.d.
% Distributed generators data and production cost
Del.pckg=[50,1,1,50];% pakaging factors
Del.VGcap=10000; % Virtual generators capacity (virtually inf)
Del.ts=1; % 1-h simulation time step
Del.STn=1; %
Del.STEs=0.04; %
Del.STPpeak=0.2800; %
Del.PVn=1; %
Del.PVTa=30; %
Del.PVTno=43; %
Del.PVIsc=1.8; %
Del.PVItc=1.4;%
Del.PVVoc=55.5; %
Del.PVVtc=194;%
Del.PVVPmax=38;%
Del.PVIPmax=1.32;%
Del.EVPp=6.73;%
Del.SCn=300;%
Del.Inc=0.0240; %
Del.MScm=1.3;%
Del.SCn=7e2;%
Del.WWSrated=9.5; % rated Wind
Del.Eprice=@(L)-5.13717E-09*L^2+5.31538E-05*L; % price of the electricity from the total load demanded L
%% Barry island: Load the Heat District Network data
Temp=load('D.mat');
Dth=Temp.D.Dth; % load the structure of the 'thermal' network
%% show topology of the two networks (not linked)
figure
G_th=graph(Dth.From_Node,Dth.To_Node);
G_th.plot;
hold on; grid on
G_el=graph(Del.FDks,Del.FDke);
G_el.plot
legend('Thermal nodes', 'Electrical nodes')
%% 1) Start With Electric Network Economic Dispatch
% The Generators Allocation Matrix
x=zeros(Del.NDn,Del.DGtn+1);
x(Del.MSnod,1)=1;
% the meccanical states
FDmecst=ones(Del.FDn,1); %feeders meccanical state
NETmecst=ones(Del.NDn,Del.DGtn+1); %feeders meccanical state
% Loads
LD=normrnd(Del.muLDth,Del.stdLDth); % MWel of the 5 lumped electrical loads
% MS
MSPp = normrnd(Del.MSmu, Del.MSsig);
MSPav = MSPp(ones(Del.NDn,1),:);
% DGs Storage systems (ST)
ik=1;
STlev = rand(Del.NDn, Del.STn).*Del.STEs(ones(Del.NDn,1),:);
STPav = STP(STlev, x(:,1+ik), Del);
STPav = STPav.*NETmecst(:,1+ik);
% MCHP
% DGPav=[..Pav MCHPav STPav]
DGPav=x(:,2:end);
NETPavM=[MSPav DGPav]; %Matrix of electric power Available
[Pgen,ENS, NETminCo, PNETu, PDGu, ef] = OPF(x, NETPavM, LD, FDmecst, Del);
PowTh=PowEl2PowTh(Pgen,Del);