data: upgrades to eastern transmission for base case feasibility #74
Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
These changes obtain feasibility for the Eastern base case. The first four changes (by branch ID) achieve general feasibility with the scaled-up generation capacity: ensuring that there is no conflict between generator Pmins and their associated transformer ratings (tested in Scenario #307). The rest of the changes achieve feasibility through the summer months without any load curtailment, and were tested in Scenario #308 and #309. For each branch, the
rateA
field is multiplied by a scale factor, and thex
field is divided by the scale factor (as branches are scaled in the change_table).See: https://github.com/intvenlab/RenewableEnergyProject/issues/193