Skip to content

Latest commit

 

History

History
34 lines (24 loc) · 1.87 KB

FAQ.md

File metadata and controls

34 lines (24 loc) · 1.87 KB

FAQ

Support

If you experience problems with the package, please send an email to [email protected] with following this checklist:

  • read the publication first, it will give you a lot of technical details
  • attach a list of input files (ASCII files with river bank points)
  • attach an R script with the relevant run commands you used
  • attach images showing the problem (optional)

Common technical fails

1. Maximum iterations

### exit due to maximum iterations (max. iterations = 20) ###
Note: this may be caused by gaps that opened in the centerline due to
jagged centerline paths. First, check for gaps visually with CM.plotPlanView(cmgo.obj, set="set1", error=1). 
You can than either repair these gaps by editing the centerline paths manually or 
simply increase the bank resolution via parameter par$bank.interpolation.max.dist! 

There is two common issues with that. To find out, which applies use the suggested command from the error message and enter a zoom.length to show the problem:

CM.plotPlanView(cmgo.obj, set="set1", error=1, zoom.length=20)

1.1 Gaps occurred in the centerline

drawing

If your plot shows something similar to the left image decrease the value of the parameter par$bank.interpolate.max.dist and run the program again.

1.2 Segment cut-off not yet finished

drawing

In case you image shows open side arms of the centerline cmgo will handle that case if you increase the parameter par$bank.filter2.max.it. By default there is 20 iterations to remove those sidearms. Increase to a higher value (e.g. 50) and rerun the program.